Weekly team report

A weekly team report template built to be scanned in under a minute: wins, metrics against target, risks with an ask, and next week's focus.

Last updated

Fill in the blanks

Assembled in your browser — nothing you type is stored or sent anywhere.

Your document

# Weekly report: Growth Engineering **Week of:** Sep 1-5, 2026 · **Author:** Kabir ## Wins - Shipped the referral-link redesign; click-through is up 18% in the first three days. - Closed the flaky checkout test that had been blocking CI for two weeks. ## Metrics vs. target Signups: 1,240 vs. 1,400 target (89%). Activation rate: 42% vs. 40% target (105%). CI pass rate: 91% vs. 95% target (96%). ## Risks (with asks) CI pass rate is still below target - root cause is a shared test database that gets corrupted under parallel runs. Ask: two days from Platform to give CI its own ephemeral database. ## Next week's focus Ship the onboarding checklist A/B test, pair with Platform on the CI database fix, and start discovery on the referral cap.

How to use it well

  • →Lead with the metric, not the activity - "shipped the redesign" is a fact about your calendar, "click-through up 18%" is a fact about whether it worked.
  • →A risk without an ask is just a complaint the reader can't act on. Naming exactly what you need, and from whom, is what turns a status report into something a manager can actually unblock.
  • →Four sections, one screen. The moment a weekly report needs scrolling, people start skimming the wins and skipping the risks - which is the one section that most needs reading.

Part by part

## Metrics vs. target
Against target, not in isolation. A number without its target is trivia — the comparison is what makes it a status.
## Risks (with asks)
The parenthesis is the whole point. A risk raised with no ask is a disclaimer; a risk with a specific ask is a request the reader can act on.
## Next week's focus
Forward-looking, so the report is a plan as well as a record. It also creates the comparison that makes next week's wins section meaningful.

Common mistakes

  • Listing everything the team did.

    Activity is not progress, and a full list buries what mattered. Wins should be things that moved a metric or unblocked something, not a record of the week's effort.

  • Raising risks without an ask.

    A risk with no request is a way of being on record rather than a way of getting help. Naming what you need converts it from a disclaimer into a decision someone can make.

  • Reporting metrics with no target.

    Signups were 340 says nothing without whether 340 is good. The comparison is the information, and omitting it lets a bad week read as a neutral one.

Questions

Who is the audience?

Usually a manager or a peer team, reading quickly. That means the report is optimised for scanning — headings, short bullets, and the number that matters first in each section.

What belongs in wins?

Things that changed a metric, unblocked someone, or shipped. If an item cannot be tied to one of those, it probably belongs in the record of work rather than in a weekly report.

Should bad news go in?

Especially. A report that only ever contains wins stops being read as information, and the first genuinely bad week then arrives as a shock rather than as the trend it was.

Is weekly the right cadence?

For most teams, yes — short enough to be specific, long enough to show movement. Daily produces noise, and monthly is too late for a risk raised in the first week.